Warning: include_once(): open_basedir restriction in effect. File(/www/wwwroot/business/aifina.cn/two/wp-content/plugins/wp-super-cache/wp-cache-phase1.php) is not within the allowed path(s): (/www/wwwroot/aifina.cn/two.aifina.cn/:/tmp/) in /www/wwwroot/aifina.cn/two.aifina.cn/wp-content/advanced-cache.php on line 22

Warning: include_once(/www/wwwroot/business/aifina.cn/two/wp-content/plugins/wp-super-cache/wp-cache-phase1.php): failed to open stream: Operation not permitted in /www/wwwroot/aifina.cn/two.aifina.cn/wp-content/advanced-cache.php on line 22

Warning: include_once(): Failed opening '/www/wwwroot/business/aifina.cn/two/wp-content/plugins/wp-super-cache/wp-cache-phase1.php' for inclusion (include_path='.:') in /www/wwwroot/aifina.cn/two.aifina.cn/wp-content/advanced-cache.php on line 22

Warning: include(): open_basedir restriction in effect. File(/www/wwwroot/business/aifina.cn/two/wp-content/plugins/wp-super-cache/wp-cache-base.php) is not within the allowed path(s): (/www/wwwroot/aifina.cn/two.aifina.cn/:/tmp/) in /www/wwwroot/aifina.cn/two.aifina.cn/wp-content/plugins/wp-super-cache/wp-cache.php on line 113

Warning: include(/www/wwwroot/business/aifina.cn/two/wp-content/plugins/wp-super-cache/wp-cache-base.php): failed to open stream: Operation not permitted in /www/wwwroot/aifina.cn/two.aifina.cn/wp-content/plugins/wp-super-cache/wp-cache.php on line 113

Warning: include(): Failed opening '/www/wwwroot/business/aifina.cn/two/wp-content/plugins/wp-super-cache/wp-cache-base.php' for inclusion (include_path='.:') in /www/wwwroot/aifina.cn/two.aifina.cn/wp-content/plugins/wp-super-cache/wp-cache.php on line 113

Warning: include_once(): open_basedir restriction in effect. File(/www/wwwroot/business/aifina.cn/two/wp-content/plugins/wp-super-cache/ossdl-cdn.php) is not within the allowed path(s): (/www/wwwroot/aifina.cn/two.aifina.cn/:/tmp/) in /www/wwwroot/aifina.cn/two.aifina.cn/wp-content/plugins/wp-super-cache/wp-cache.php on line 136

Warning: include_once(/www/wwwroot/business/aifina.cn/two/wp-content/plugins/wp-super-cache/ossdl-cdn.php): failed to open stream: Operation not permitted in /www/wwwroot/aifina.cn/two.aifina.cn/wp-content/plugins/wp-super-cache/wp-cache.php on line 136

Warning: include_once(): Failed opening '/www/wwwroot/business/aifina.cn/two/wp-content/plugins/wp-super-cache/ossdl-cdn.php' for inclusion (include_path='.:') in /www/wwwroot/aifina.cn/two.aifina.cn/wp-content/plugins/wp-super-cache/wp-cache.php on line 136
工程招标代理资质申请过程 - 北京代理记账

工程招标代理资质申请过程

2021-10-11上一篇 : |下一篇 :

亿诚建设项目管理有限公司作为专业工程造价咨询机构,拥有十年行业丰富经验,最新工程造价咨询动态请关注亿诚项目管理搜狐号。

全过程跟踪审计主要内容:事前跟踪审计、事中跟踪审计、事后跟踪审计

建筑工程项目全过程跟踪审计是指审计部门依据相关法律的规定,对建筑工程项目从项目建设前期准备工作至项目竣工验收交付使用全过程全部经济活动的真实性、合法性、合规性、完整性和效益性进行监督、检查和评价,并针对建设过程中存在的问题及时提出审计意见和建议,促进基建部门、施工单位、监理单位等强化管理,有效地控制工程成本,保障建设资金的合理使用,提高建设项目投资效益。

事前跟踪审计阶段

在工程前期,是整个工程的准备阶段,跟踪审计需在事前控制中要发挥应有作用,才能有效避免在之后的施工阶段和竣工阶段出现难以预料的问题。事前跟踪审计主要包括项目可行性研究阶段的审计、项目设计阶段的审计和项目招投标阶段的审计

1. 项目可行性研究阶段的审计建筑工程项目可行性研究是项目投资前期工作的核心和重点,也是项目决策的重要依据。在对这一环节的审计中,应把握以下几点:专家意见是否客观、独立,反对意见是否得到重视;可行性研究报告是否在客观的前提下,通过对项目要素进行认真全面的调查和详细的测算分析,经过多方案的比较论证后提出的;项目建议书是否坚持实事求是的原则;拟建项目的各要素是否进行认真的调查研究,测算分析是否符合实际情况;项目是否具备经济上的必要性、合理性、现实性;环境及建设上是否具备可行性等。

2.项目设计阶段的审计建筑工程项目的设计方案是整个项目的蓝图,事关整个项目建设的最终成败。在对这一阶段的审计中,审计人员应重视以下几个方面:建筑工程建设理由及条件;工程选址及建设规模;经济效益、环境效益及社会效益等内容是否在工程设计方案中充分说明;是否满足设备的选型、征地、投资控制、编制施工图设计的需要;施工图的设计是否满足建筑材料的选用、设备的安装和非标准件制作的需要,是否满足施工图预算的编制、施工组织设计和现场施工方面的需要;设计阶段相关费用是否合规合理等。

3.项目招投标阶段的审计建筑工程项目建设招投标是项目单位按照《招标投标法》要求,利用现有建筑市场,全面引进竞争机制,保证工程质量,降低投资成本的有效途径。在对这一环节的审计中,审计人员应重点关注以下内容:招投标程序是否合法,操作是否规范;投标单位的资质是否合规,能力是否达标;招投标单位的之间是否存在串通投标;招标小组评标办法是否公正、公平、科学、合理。